Our all time track record
10,800 litres SWH
Kakamega
5kWp Solar Water Pumping Project
Uninterrupted power supply to the hospital allowing 24h service provision.
Reduced power costs and ceased usage of electric water heating
Over 400,000/= savings per month
60% reduction on precious electricity costs.
30% reduction on electricity costs
Expansion of existing 1.2MWp plant to 1.45MWp Injection of over 271,000kWhrs into the system.
Mwache Junction, Tsunza- Mteza section (Ongoing Project) 38kM Road solar lighting Over 1000 Lights Project
2,000 Liters of centralized solar water heating systems
62500 liters SWH Project
Combined 20KW off-grid PV system
15 kWp Solar Water Pumping
Sandal wood