Our all time track record
Uninterrupted power supply to the hospital allowing 24h service provision.
Reduced power costs and ceased usage of electric water heating
Over 400,000/= savings per month
10,800 litres SWH
Kakamega
5kWp Solar Water Pumping Project
60% reduction on precious electricity costs.
30% reduction on electricity costs
Expansion of existing 1.2MWp plant to 1.45MWp Injection of over 271,000kWhrs into the system.
Mwache Junction, Tsunza- Mteza section (Ongoing Project) 38kM Road solar lighting Over 1000 Lights Project
2,000 Liters of centralized solar water heating systems
62500 liters SWH Project
Combined 20KW off-grid PV system
15 kWp Solar Water Pumping
Sandal wood